Every machine, every plant needs a strong heart. And above all, a good brain! Controlling, networking and visualizing processes and states for the user with precision: Bringing these tasks into a smooth flow is the core task of automation. Regardless of whether it's a matter of handling a complete project or improving a subcycle.

Coordination with expertise

From the start of the project to its completion – and beyond: A gat project manager provides you with expert support in all phases and questions, is in permanent contact with our administration and the project team and can thus integrate planning changes quickly and efficiently into the process without delay. Afterwards, you will also be in the best hands for maintenance and service. Contact us in the areas of:

  • Basic und detail engineering
  • Compressor controls
  • Turbine controls
  • E-/MSR assemblies
  • Steam and process heat
  • Automation of industrial power plants

Our successfully completed projects from the field of machinery & plants:

EMSR assembly of a compressor station

For compressor stations for gas transport, the gat team took over the skid assemblies and ancillary systems of instrumentation, air supply and trace heating of electrically driven turbo compressors.

Rebuild of cold roll, hot roll, mill, coiler

On behalf of a leading supplier of high-quality rolled products, gat carried out extensive work in the field of EI&C for a plant modernization.

MSR assembly for water treatment in pulp mill

Within the scope of a new building for a pulp mill, gat realized the assembly, cabling and commissioning of the I&C technology for a partial plant for water treatment.

Control cabinets for turbo compressor with gas turbine

To secure the energy supply of a gas field, gat supplied the control cabinets including software for a turbo compressor with gas turbine drive for a German plant manufacturer.

Burner control for process heat boilers

gat received the order for the planning, delivery, control, installation and commissioning of two new process heat boilers from a plant manufacturer.

Upgrading the automation in the power plant

For a mining company, gat expanded the control networking of the energy and process steam supply of the sites. The goal: to increase availability and reduce emissions through optimized use.

Boiler & burner control for 120t/h industrial steam generator

gat took over the complete EI&C part for the industrial steam generator of a plant manufacturer, planned and delivered the burner and boiler control including connection to the site control system.

Steam boiler equipment for FPSO vessel

gat planned, manufactured & delivered the power distribution and supply as well as the control cabinets incl. programming and visualization for a total of three steam boilers of a FPSO vessel (Floating Production Storage and Offloading).

PCS7 system adjustments with preparation & implementation of migration

For a compressor station, we revised the existing control technology (four turbo compressors) as well as the operating station automation of the installed Siemens PCS7 control system to the current version of the APL modules in preparation for the upcoming migration to Vers. 9.

Automation of sewage sludge transport in the power plant

gat planned and supplied the automation and EMS installation for a sewage sludge conveying system in the waste-to-energy plant. Execution and acceptance were carried out according to the power plant regulations.

Ihr Ansprechpartner

Wenden Sie sich in allen Fragen gern an:

Karsten Hofmann +49 (0)4152 / 8097-35 Karsten.Hofmann(at)gatgmbh.de