New build or retrofit?

Not every plant that’s getting on in years needs replacing. Often an update in the right place is enough – planned, inside the shutdown window, with no extra downtime.

Don’t wait for something to break

For plants that are slowly getting on in years but still work well in principle, retrofit and modernisation measures during a planned shutdown are often worthwhile. In other words: don’t wait for a failure before you react – use the time windows that regular shutdowns provide anyway! That saves time and money – and builds optimisation seamlessly into existing processes.

 

The advantages:

  • Faster to implement than a new build

  • Often less resource-intensive than full replacement

  • Modernisation can be carried out during shutdowns or built into maintenance cycles – which reduces downtime

 

Retrofit Plus: a technical upgrade instead of mere maintenance

  • Greater energy efficiency

  • Optimised processes and product quality

  • Integration of up-to-date control technology

  • Groundwork for future expansion

  • A longer service life for the plant

Is a retrofit worth it for your plant?

We’ll take a look at what can be renewed and what can stay. I look forward to hearing from you: